“The tolerance drifts after the first batch.”
The buyer’s problem: “The first samples were perfect. Then batch three came back out of tolerance and I only found out when my own line stopped.”
What we do: First-article inspection on every new setup. In-process checks by the operator on critical dimensions. Outgoing inspection against the drawing before anything is packed — measured on an Accretech CVA800A CMM, a Mitutoyo Quick Vision Apex, and an Accretech SUR1500 surface tester that live in our own building.
You get: part 100 that matches part 1, and measurement data we can send you when a dimension is questioned.


















